This illustration provided by Astrobotic Technology in 2024 depicts the Peregrine lunar lander on the surface of the moon. (Astrobotic Technology via AP)
Astronauts will have to wait until next year before flying to the moon and another few years before landing on it, under the latest round of delays announced by NASA on Tuesday.
The space agency had planned to send four astronauts around the moon late this year, but pushed the flight to September 2025 because of technical issues. The first human moon landing in more than 50 years also got bumped, from 2025 to 2026.
The news came barely an hour after a Pittsburgh company abandoned its own attempt to land its spacecraft on the moon because of a mission-ending fuel leak.
Launched on Monday as part of NASA's commercial lunar program, Astrobotic Technology's Peregrine lander was supposed to serve as a scout for the astronauts. A Houston company will give it a shot with its own lander next month.
NASA is relying heavily on private companies for its Artemis moon-landing program for astronauts, named after the mythological twin sister of Apollo.
PepsiCo's "Rolling Remembrance" American Flag Relay Puts Veteran Drivers at the Wheel to Raise Funds and Awareness for Children of Fallen Patriots Foundation
Fresh off the company’s IPO at the New York Stock Exchange Bowhead Specialty CEO Stephen Sills discusses what’s next and why some insurance rates are rising.
AAA predicts a surge in summer 2024 travel, with 44 million travelers, surpassing pre-pandemic levels. Expect more solo trips, AI use, and Taylor Swift.
As Americans prepare for a long weekend of grilling, Impossible Foods wants to put aside the culture wars, win over meat eaters – and IPO when it's 'ready.'
In April, grocery prices rose by 1.2 percent, reaching pre-pandemic levels of food inflation. Could an e-commerce grocer be the solution? Thrive Market says yes